Subcontractors

Capital Development Board Project #630-000-285

Project Description

Ellis Grove: Construction of a 4,500 gross sf, unheated, wood framed Storage building of S-1 Use Group. Building includes truck storage bays, salt storage bay with 10’ high concrete walls, electrical, lighting, ventilation, man doors, overhead doors, concrete floor, concrete approach aprons and gravel approach driveways. (The Client Agency will demolish the existing storage building under the Base Bid.)

 

Tilden: Construction of a 3,375 gross sf, unheated, wood framed Storage building of S-1 Use Group. Building includes truck storage bays, salt storage bay with 10’ high concrete walls, electrical, lighting, ventilation, man doors, overhead doors, concrete floor, concrete approach aprons and gravel approach driveways. (The Client Agency will demolish the existing storage building under the Base Bid.)

TRADE
General
COST Range
under $2,500,000.00
BID DATE/TIME
Tuesday, December 9, 2025; 11am

Issue for Bid – Project Manual

Issue for Bid – Drawings

Submit a Bid Proposal